Sunday 27 May 2012

 First frames on site

Looking at the height of the men gives a good perspective of the overall height

Monday 21 May 2012

 Pour number two begins
 Lovely winter morning
 Busy bees

Haven't times changed, a concrete pump makes a big difference to the amount of concrete you can pour nowadays and is a bit easier on the back as well!

Sunday 20 May 2012


 Perfect day for concrete
First light and the first of the floor pours is under way

Wednesday 16 May 2012

Panels being installed by crane
 Panels being placed
 Challenging in the rain with trucks getting stuck



 Panels in and braced
 Lowering panel into place

Reinforcing steel ready for pouring concrete thickening to panels
 Feature panel being loaded onto truck in yard

Monday 14 May 2012

 Foundations poured ready for floors

Mesh laid out and extra thickenings under the floor for added strength

Tuesday 8 May 2012


Top photo is the first of the floors being prepped ready for pouring and the bottom photo is the other feature panel after it was poured this week, ready for finishing as the concrete sets.

Sunday 6 May 2012

 One of the precast panels being lifted after it has hardened up on the panel bed.
This is one of the coloured feature panels that will eventually have some timber inserts in a rebate that was formed before pouring.

Wednesday 2 May 2012