 The first concrete has been poured on site with the bulk of the foundations poured. This will now be prepped ready for the rest of the hardfill to be placed within the foundations in readiness for the floor slab to sit on top.
 Concrete going in. In the background students from NMIT carpentry course look on as they have recently been studying reinforcing steel so Instructor Alan Barnes asked if they could view the steel in place and the concrete being poured. Of course we all need to learn so we are happy to be able to help up and coming potential tradespeople.
Approximately 30 cubic metres of concrete was poured.